The History of Lakeside: A Legacy of Water and Community
Origins and Development
The development of Lakeside commenced in 2002 under the direction of Delfin Lend Lease. At the heart of this project was the creation of 28 hectares of public open space, anchored by a central 6.5-hectare lake. This landmark was designed to be more than just a scenic view; it was built to provide a balance of environmental, social, and recreational benefits for the local community.
Engineering with Nature: Water Sensitive Urban Design (WSUD)
Lakeside was a pioneer in Water Sensitive Urban Design (WSUD). The lake serves as a massive, functional stormwater treatment system, designed to capture and filter runoff from the cultural centre, surrounding roads, and residential areas.
The process follows a specific natural sequence:
In addition to the main lake, a series of wetlands were established along Toomuc Creek to treat residential runoff before it enters the natural creek system, protecting the broader ecosystem.
Life in and on the Water
Because of the high water quality maintained by this filtration system, the lake has become a thriving habitat and a place of recreation.
A 20,000-Year Connection to Water
It is no coincidence that a modern community was built here. For over 20,000 years, this exact landscape—defined by the adjoining Toomuc Creek—was a hub for the Traditional Owners, The Bunurong Peoples.
Fun Fact: About five years ago, the lake’s water level dropped to an all-time low. Upon investigation, it was discovered that someone had actually pulled the “main plug,” causing the lake to drain slowly over several months!